Follow us:
Subscribe to our newsletter or print magazine
  • Wier_minerals Premium Banner

National Resources Review: A Mining Magazine logo

  • News
  • Projects
  • Business and Finance
  • Events
  • Products and Services
  • Online Magazine
  • Videos
  • Advertise
  • Contact
Home
  • News
  • Projects
  • Business and Finance
  • Events
  • Products and Services
  • Online Magazine
  • Video
  • Advertise
  • Contact
  • Mining and technology leaders join forces to drive decarbonisation in mining
  • ETU warns of solar farm site conditions
  • Gold production from top eight companies expected to increase by up to 3.1 per cent in 2021
  • Organisations call for commitment to halve Australia’s emissions by 2030

Non-invasive passive seismic survey commences at Torrens’ Mt Piper project

03 Mar, 2021
108
Torrens’ exploration geologist, Dr David Willis, collecting passive seismic data at Mt Piper. Image courtesy of Torrens Mining Limited.


Gold and copper explorer Torrens Mining Limited has commenced a passive seismic survey at the company’s 100 per cent owned Mt Piper Gold Project in Central Victoria, where it is also undertaking a soil geochemical sampling program.

The Mt Piper Project is located approximately 30 kilometres from Kirkland Lake’s Fosterville Gold Mine and 1 kilometre from Mandalay Resources’ Costerfield Gold Mine.

Passive seismic surveying is a surface geophysical survey method, used to rapidly define geological structures, which may focus gold mineralisation, and the thickness of cover rocks.

The survey is non-invasive and involves the measurement of natural or ambient seismic vibrations. The results will be used to help Torrens to plan drillhole locations and targets.

Survey data is collected using a ’tissue box’ sized miniaturised seismometer which is placed on the ground at 50-metre spacings and left in place for 20 minutes, during which time the geologist undertaking this work maps the surrounding geology.

The survey data is downloaded at the end of each day’s work and the results processed by consulting geophysicists, Resource Potentials, in Perth, with results expected by early April 2021.

In 2019, a passive seismic survey was completed in Victoria by a University of Melbourne Honours student and was sponsored by Chalice Mining Limited. The survey was completed over Chalice’s Pyramid Hill Gold Project and was designed to characterise the depth to the basement.

The results are reported to have successfully defined the bedrock (Castlemaine Group) and several geological structures.

Torrens Managing Director, Steve Shedden, said: “The use of passive seismic in gold exploration is a relatively new technique, but we’re excited to employ it at Mt Piper, given the success Chalice Mining had at their Pyramid Hill Gold Project.”

“Torrens has also been involved with its use at its Elizabeth Creek Copper Project in South Australia,” Mr Shedden shared.

“This non-invasive geophysical technique is expected to greatly improve Torrens’ understanding of the basement structures and materially assist us in refining our drillhole locations for 2021.”

Some next steps for the company include: ongoing soil sampling, passive seismic surveying and geological mapping over gold target areas; regional geophysical interpretation and target generation; and planning of first-pass drill targeting.

Related Articles

Challenger reports extensions to high-grade gold mineralisation at Hualilan

New Century provides update on drilling at Silver King

De Grey to drill deeper to test large target area in more detail

New tenement paves the way for the Mt Piper Gold Project

all news all projects

Latest Posts

  • Latest News
  • Latest Projects
  • Tenders
16 Apr

Mining and technology leaders join forces to drive decarbonisation in mining

16 Apr

ETU warns of solar farm site conditions

16 Apr

Gold production from top eight companies expected to increase by up to 3.1 per cent in 2021

15 Apr

Organisations call for commitment to halve Australia’s emissions by 2030

12 Apr

Coal production from top ten mining companies expected to increase by up to 6.6 per cent in 2021

19 Apr

AGL and Idemitsu prepare for next stage of feasibility on Bells Mountain

16 Apr

Big Canberra Battery market sounding opens

16 Apr

Fortescue celebrates 1.5 billion tonnes shipped from Pilbara operations

16 Apr

Bibiani Mining Lease restored

15 Apr

BHP, Oldendorff and GoodFuels complete marine biofuel trial in Singapore

28 Feb 2022

Operational Telecommunications Equipment Infrastructure and Services

Not Stated   

Northern Gas Pipeline Construction

Not Stated   

RFT – Electricity Supply

See All Tenders

Online Magazine

    Current Magazine Cover
  • Login
  • Subscribe

Subscribe

Subscribe to our email newsletter or print magazine.

Our Titles

  • Home
  • Contact Us
  • Terms and Conditions
  • Privacy
© Sage Media Group 2021 All Rights Reserved.
×
Authorization
  • Registration
 This feature has been disabled
 This feature has been disabled until further notice, however you may still register
×
Registration
  • Autorization
Register
* All fields required