Projects

  • Katanning

    PROJECTS

    Punters ignoring junior’s Katanning Gold Project efforts  

    It’s possible that a domestically-listed gold explorer, which boasts a not-too-shabby evolving flagship project in Western Australia’s Wheatbelt, may be looking to lithium to help boost its languishing mark... more

  • junior

    PROJECTS

    WA junior to unlock geological secrets of possible giant

    A West Australian junior involved in a number of exploration projects is confident it has come across an iron oxide-gold-copper (IOCG) deposit in its home state. Late last year, Miramar Resources Ltd (ASX:M2... more

  • lithium

    PROJECTS

    New lithium mine set to boost WA’s credentials as battery hub

    Joint venture partners Covalent Lithium, Wesfarmers and Sociedad Química y Minera de Chile (SQM) have opened of the Mt Holland lithium mine and concentrator project. The Mt Holland lithium project consists ... more

  • Prospectivity of Niobium-REE at BMG’s Dragon project

    PROJECTS

    Prospectivity of Niobium-REE at BMG’s Dragon project

    BMG Resources Limited has announced promising results from its ongoing exploration review of the Dragon project neighbouring WA1 Resources’ site in the West Arunta region of Western Australia. Multiple tar... more

  • Punters ignoring junior’s Katanning Gold Project efforts  
  • WA junior to unlock geological secrets of possible giant
  • New lithium mine set to boost WA’s credentials as battery hub
  • Prospectivity of Niobium-REE at BMG’s Dragon project

Graphite project edges closer to contributing to global decarbonisation

In mid-February a Perth-based dual-listed resources house took a major step towards establishing a sovereign national graphite project which entailed a ‘mine to market’ capability and integrated operations located within its home state of Western Australia. In doing so, it moved further towards its goal of becoming a significant player in the global processed graphite market. International Graphite Ltd (ASX: IG6) has just completed the successful wet commissioning of its new $1.5 million, 200 tonnes per annum graphite micronising plant in the coal mining town of Collie in WA using imported graphite concentrates. To be known as the Collie BAM…

Junior player hard at work in both Australia and the US

An ASX-listed junior is looking to expeditiously dual-track its two lithium projects during the coming year, with the Perth-based Future Battery Minerals Ltd (FBM) targeting deposits in both Western Australia and the US state Nevada. In WA, the prize is its wholly-owned Kangaroo Hills, located just 17 kilometres south of the historic gold town of Coolgardie, where a high grade lithium-caesium-tantalum pegmatite discovery has so far returned an assay of 29 metres at 1.36 per cent lithium. Meanwhile, in southern Nevada, the aptly-named Nevada Lithium Project (NLP), in which the junior has an 80 per cent interest, is a large-scale…

Crown Prince mineral resource estimate increases to 240koz

Ora Gold Limited has announced a significant update to the mineral resource estimate (MRE) for the Crown Prince Prospect at its flagship Garden Gully Gold Project, located in the heart of the prolific Murchison gold district near Meekatharra, Western Australia. The total resource at Crown Prince has now reached 240,000 ounces of gold at a grade of 4.1g/t Au, a considerable growth from its 2019 estimate. Notably, 68 per cent of these ounces fall within the Indicated JORC category, highlighting the enhanced drill density and improved geological understanding of the prospect. This advancement underscores the prospect's strong open pit mining potential,…

Exploration commences at Maggie Hays Hill project

Intra Energy Corporation Limited has begun a comprehensive soil geochemical survey at its Maggie Hays Hill Project in Western Australia's Lake Johnston Province.  It marks a significant step in the exploration of historical gold and lithium targets within the project area. Following the acquisition of the Maggie Hays Hill (MHH) lithium and gold project, preliminary rock sampling conducted in December unveiled highly anomalous levels of tantalum, with a maximum of 390 ppm, and niobium, with a maximum of 482 ppm. These findings, reported in an ASX release on 17 January 2024, underscore the potential of the area and necessitate a comprehensive…

North Stanmore Project solidifies itself as low-cost source of HREs

Victory Metals Limited has today announced the results of its recent metallurgical test work conducted on the North Stanmore Rare Earth Element (REE)Project — situated 10 kilometres north of Cue, Western Australia. The optimised mixed rare earth carbonate metallurgy concentrate from North Stanmore has shown great proportions of dysprosium (Dy) and terbium (Tb), with Dy constituting 73.6 per cent and Tb 10 per cent of the concentrate. This composition contrasts with the figures from the commissioning Serra Verde, Pela Ema Project mixed REE concentrate product — which contains 9.4 per cent Dy and 1.6 per cent Tb. Victory Metals said…

Intra Energy acquires prospective WA lithium project

Intra Energy Corporation Limited has acquired an 80 per cent interest in the Maggie Hays Hill lithium project (MHH Project) in the prolific Lake Johnston region of Western Australia. Intra Energy Corporation Chairman Graeme Robertson stated: “The acquisition of the MHH Project opens the exciting opportunity to IEC for advanced exploration for lithium, gold, and nickel in the well-known Maggie Hays Hill area of southern Western Australia. “Initial work done by IEC and historical exploration has identified visible outcropping pegmatites with recently discovered spodumene deposits to the south providing potential for lithium. ”As this is a more advanced area than…

Progress made on Lake Maitland Uranium Project extension study

Toro Energy Limited has issued an update that its extension study to the proposed Lake Maitland Uranium-Vanadium operation — located approximately 105 kilometres southeast of the Wiluna township in Western Australia and 730 kilometres northeast of Perth. The study involves the evaluation of the incorporation of material from Toro’s 100 per cent owned Lake Way and Centipede-Millipede uranium deposits into a proposed processing operation at Lake Maitland. Toro Energy Executive Chairman Richard Homsany said: “The uranium resources at Lake Way and Centipede-Millipede are strategically located and considerable, and need to be thoroughly evaluated for viability. “The inclusion of additional material…

ARR files exploration licence for Halleck Creek project

In a move to accelerate the Halleck Creek project, American Rare Earths (ARR) has successfully filed a Licence to Explore for Minerals by Dozing with the Wyoming Department of Environmental Quality in the US. This application is a critical step towards initiating test mining operations, as the company seeks approval for two test pits at the Cowboy State Mine site. The test mining is aimed at securing the necessary ore volumes for processing at a pilot facility, setting the stage for the future scaling of an operable mine and processing unit at Halleck Creek. American Rare Earths CEO Donald Swartz…

Drilling contractor appointed for Prairie Lithium Project

Arizona Lithium Limited has selected Rhythm Engineering Inc. to oversee the drilling and completion engineering and supervision services for its Prairie Lithium Project's upcoming drilling program in Canada. It follows a comprehensive proposal review from the company and marks a pivotal milestone in Arizona Lithium Limited’s project located in Saskatchewan, Canada; which is one of Arizona Lithium's key ventures alongside the Big Sandy Lithium Project. The exploration initiative will focus on drilling into the Dawson Bay and Souris River Formations, two deeper zones identified as prospective for enriched lithium brine. These formations, lying below the Duperow formation, have not been…

Pond 1 maiden filling begins at Hombre Muerto West

ASX-listed lithium exploration and development company — Galan Lithium Limited — has provided an updated on the progress of its Hombre Muerto West (HMW) Phase 1 lithium brine project in Argentina. The company is now on track to commence lithium chloride production in the first half of 2025. Galan Lithium Limited Managing Director Juan Pablo (JP) Vargas de la Vega stated: “We are taking advantage of the summer season whereby a buffer wall has been installed at the one third mark of Pond 1. “The initial partial evaporation process will commence in approximately 14 days with the full fill of…

American Rare Earths shares latest metallurgical results

American Rare Earths has revealed significant breakthroughs in metallurgical technology as part of the SynBREE project. The project, a consortium led by Lawrence Livermore National Laboratory (LLNL), is part of the Environmental Microbes as a BioEngineering Resource (EMBER) program within the Defense Advanced Research Projects Agency (DARPA), a U.S. Department of Defense agency. The groundbreaking results include the successful preconcentration of Halleck Creek ore to 3.5% Total Rare Earth Oxide (TREO) at a 12:1 upgrade ratio. This achievement represents a remarkable approximately 200 per cent increase from the existing flowsheet design, utilising cost-effective and conventional Dense Medium Separation (DMS) techniques.…

Pathway to doré for Hualilan gold-silver deposit

Gold exploration company Challenger Gold has announced that the company’s recent metallurgical testwork program at the Hualilan Gold Project in Argentina, conducted in November 2023, has opened new avenues for the processing and profitability of the project. The initial scoping study for the project outlined a process path yielding three primary product streams: an Au-Ag concentrate from bulk flotation, a Zn-Au-Ag concentrate from sequential flotation, and Au-Ag doré from leaching of the flotation tailings-leach (FTL). A significant enhancement was identified late in the study's preparation phase, proposing the conversion of the Au-Ag concentrate into doré through a fine-grind and high-intensity…

High grade assays found at Colina Deposit in Brazil

The latest drilling results recently released by Australian-based mineral exploration company — Latin Resources Ltd — from the Colina Deposit and Fog’s Block in Brazil have yielded high-grade lithium, enforcing the project’s Tier One status. Following the previous mineral resource estimate (MRE) in June 2023, an additional 53 holes (23,617 metres) were drilled at the Colina Deposit, and 13 diamond drill holes (4,575.7 metres) at Fog’s Block. Latin Resources Vice President of Operations - Americas Tony Greenaway said: “This latest update represents a solid five months of drilling which was focused on extending the Colina Deposit to the southwest along…

Bohier Project Delivers High Grade Li2O Results

Australia-based mineral exploration company, Mont Royal Resources, has made significant progress in the Phase Two lithium exploration program at the Bohier Lithium Project, situated in the prolific Upper Eastmain Greenstone Belt in Quebec, Canada. The Bohier Lithium Project footprint has expanded through its second lithium exploration phase. The company reported high-grade results from the trenching and channel sampling program, including: 6.05 metres at 1.78 per cent lithium oxide 7 metres at 1.71 per cent lithium oxide 1 metre at 1.97 per cent lithium oxide 18 samples are currently pending results at the Actlabs laboratory facility in Val d’or, Quebec. Preparations…